Feedback details
Project feedback
The project coordinator was very helpful and provided us with the much needed guidance throughout the project duration. He was always there to nudge us to the right direction whenever we felt like we were stuck.
- Author
-
Learner
- Experience
- CAML Program – Cohort 5: 2-Week, 30-Hour Projects in Advanced Manufacturing
- Project
- Containerized Rapid Diagnostic Test Manufacturing System Prototype
- Created At
- May 4, 2025